Events

Autumn 2007 dena accepts a bid of the German company SOLAR23 for the implementation of the solar roofs programme Ndelle, Senegal.

February 2008 The components which are necessary for the project are prepared for dispatch in the logisticy centre of SOLAR23 GmbH. The dispatch to Dakar, Senegal takes place in the same month.

March 2008 The container arrives in Dakar.

April 2008 In the following month the container is transported from Dakar to Ndelle and is stored there until installation.
19 May 2008 The press conference for the beginning of the pilot project takes place in Dakar. On the same day the ground-breaking ceremony takes place in the village Ndelle which is 180 km away.

19 May 2008
– 22 May 2008
After some preparations the solar system is installed within 4 days.

June 2008 The power distribution within the village is installed by the GTZ.

17 September 2008 Inauguration

24.10.2008 - 25.10.2008 Training of 25 technicians and engineers in the offcices of EnergieR in Dakar and on site iin Ndelle.